NPGallery   Digital Asset Management System
Filter Results

Your search on Keywords contains 'milepost 80-100' returned 764 results, Showing page 1 of 13, Items 1 through 60

Page#:
Land use map documenting Blue Ridge Parkway

PLUM Section 1-J MP74.8 - MP 85.6

Land use map documenting Blue Ridge Parkway

PLUM Section 1-K MP85.6 - MP97.6

Land use map documenting Blue Ridge Parkway

PLUM Section 1-L MP97.6 - MP105.8

Conditioning existing base

Conditioning existing base

Placing wearing course at Station 27

Placing wearing course at Station 27

Barber-Greene paver placing wearing course

Barber-Greene paver placing wearing course

Rolling wearing course at Station 28-35

Rolling wearing course at Station 28-35

Straightening wearing course at Station 30

Straightening wearing course at Station 30

Texture of wearing course

Texture of wearing course

Loading topsoil from C.D. Smith pit

Loading topsoil from C.D. Smith pit

Preparing seed bed for seeding shoulders

Preparing seed bed for seeding shoulders

Sowing grass seed on shoulder

Sowing grass seed on shoulder

Completed roadway at Station 261

Completed roadway at Station 261

Completed overlook at Station 261

Completed overlook at Station 261

Cut and fill slopes before start of work

Cut and fill slopes before start of work

Cut and fill slopes before start of work

Cut and fill slopes before start of work

Cut slopes before start of work at Station 334+50

Cut slopes before start of work at Station 334+50

Drilling top of cut slope for flattening

Drilling top of cut slope for flattening

Hillside benched for toe of flattened flip slope

Hillside benched for toe of flattened flip slope

Fill slope benched for flattening at Station 139+75

Fill slope benched for flattening at Station 139+75

Flattening fill slope using hand labor and motor grader at Station 176

Flattening fill slope using hand labor and motor grader at Station 176

Pay loader excavating roadway ditch at Station 335

Pay loader excavating roadway ditch at Station 335

Bulldozer spreading topsoil on day lighted section

Bulldozer spreading topsoil on day lighted section

Lining seed bed

Lining seed bed

Mulching seeded area using modified hay chopper

Mulching seeded area using modified hay chopper

Hand mulching seeded area

Hand mulching seeded area

Tacking down mulch with asphalt spray

Tacking down mulch with asphalt spray

Flattened and seeded slope at Section 120

Flattened and seeded slope at Section 120

Flattened and seeded slopes at Station 157

Flattened and seeded slopes at Station 157

Flattened and seeded slopes at Station 130

Flattened and seeded slopes at Station 130

Flattened and seeded slopes at grade separation structure in Bear Wallow Gap

Flattened and seeded slopes at grade separation structure in Bear Wallow Gap

Flattened and seeded slopes at intersections of Virginia Secondary Route 616

Flattened and seeded slopes at intersections of Virginia Secondary Route 616

Barber-Greene laydown machine placing bituminous binder. Automatic screed control device in foreground

Barber-Greene laydown machine placing bituminous binder. Automatic screed control device in foreground

Three-wheel breakdown roller immediately behind paver

Three-wheel breakdown roller immediately behind paver

Dumping hot mix into the paver

Dumping hot mix into the paver

Completed binder course on divided roadway at Peaks of Otter

Completed binder course on divided roadway at Peaks of Otter

Bituminous curbs at ends of median at Peaks of Otter, later removed because of maintenance problems

Bituminous curbs at ends of median at Peaks of Otter, later removed because of maintenance problems

Installation of utilities conduit at Peaks of Otter

Installation of utilities conduit at Peaks of Otter

Installation of 6

Installation of 6" underdrain along VA Route 43

End of box culvert where new masonry headwall is to be constructed

End of box culvert where new masonry headwall is to be constructed

New masonry headwall partially completed

New masonry headwall partially completed

Box culvert carrying pedestrian trail from Peaks of Otter Lodge to receive new masonry headwall

Box culvert carrying pedestrian trail from Peaks of Otter Lodge to receive new masonry headwall

Workman placing ring stone for new headwall

Workman placing ring stone for new headwall

Stripping topsoil

Stripping topsoil

Rough grading

Rough grading

Excavation for retaining wall

Excavation for retaining wall

Retaining wall under construction

Retaining wall under construction

Retaining wall partially complete

Retaining wall partially complete

Concrete mixing and pouring

Concrete mixing and pouring

Box culvert under construction

Box culvert under construction

Pipe headwall

Pipe headwall

Box culvert dry masonry wall

Box culvert dry masonry wall

Quarry site

Quarry site

Crusher in operation

Crusher in operation

Unfinished drop inlet and gutter

Unfinished drop inlet and gutter

Slide on cut bank

Slide on cut bank

Drop inlet and gutter

Drop inlet and gutter

Completed roadway

Completed roadway

Completed road showing dual lanes

Completed road showing dual lanes

Peaks of Otter area

Peaks of Otter area


Page#: