Your search on Keywords contains 'milepost 80-100' returned 764 results, Showing page 1 of 13, Items 1 through 60
PLUM Section 1-J MP74.8 - MP 85.6
PLUM Section 1-K MP85.6 - MP97.6
PLUM Section 1-L MP97.6 - MP105.8
Conditioning existing base
Placing wearing course at Station 27
Barber-Greene paver placing wearing course
Rolling wearing course at Station 28-35
Straightening wearing course at Station 30
Texture of wearing course
Loading topsoil from C.D. Smith pit
Preparing seed bed for seeding shoulders
Sowing grass seed on shoulder
Completed roadway at Station 261
Completed overlook at Station 261
Cut and fill slopes before start of work
Cut slopes before start of work at Station 334+50
Drilling top of cut slope for flattening
Hillside benched for toe of flattened flip slope
Fill slope benched for flattening at Station 139+75
Flattening fill slope using hand labor and motor grader at Station 176
Pay loader excavating roadway ditch at Station 335
Bulldozer spreading topsoil on day lighted section
Lining seed bed
Mulching seeded area using modified hay chopper
Hand mulching seeded area
Tacking down mulch with asphalt spray
Flattened and seeded slope at Section 120
Flattened and seeded slopes at Station 157
Flattened and seeded slopes at Station 130
Flattened and seeded slopes at grade separation structure in Bear Wallow Gap
Flattened and seeded slopes at intersections of Virginia Secondary Route 616
Barber-Greene laydown machine placing bituminous binder. Automatic screed control device in foreground
Three-wheel breakdown roller immediately behind paver
Dumping hot mix into the paver
Completed binder course on divided roadway at Peaks of Otter
Bituminous curbs at ends of median at Peaks of Otter, later removed because of maintenance problems
Installation of utilities conduit at Peaks of Otter
Installation of 6" underdrain along VA Route 43
End of box culvert where new masonry headwall is to be constructed
New masonry headwall partially completed
Box culvert carrying pedestrian trail from Peaks of Otter Lodge to receive new masonry headwall
Workman placing ring stone for new headwall
Stripping topsoil
Rough grading
Excavation for retaining wall
Retaining wall under construction
Retaining wall partially complete
Concrete mixing and pouring
Box culvert under construction
Pipe headwall
Box culvert dry masonry wall
Quarry site
Crusher in operation
Unfinished drop inlet and gutter
Slide on cut bank
Drop inlet and gutter
Completed roadway
Completed road showing dual lanes
Peaks of Otter area