Select Item below to DOWNLOAD - Once item is selected, right click and choose 'save as'
The National Park Service is committed to making its electronic and information technologies accessible to individuals with disabilities.
If you require assistance or wish to report an issue related to the accessibility of any content on this website, please email NPGallery@nps.gov
f9cd3333034949e896a0e76b3aa9fe0f
ZION 5087 Superintendents Monthly Report 1934 01
Report on the conditions of Zion and Bryce National Parks for January, 1934written on February 10, 1934 Topics include: General: Introductory; General Weather Conditions Administration: Park Inspections by Superintendent; Park Inspections by Other Interior Department Officers; Labor Situation; Plans, Maps, and Surveys; Publicity Maintenance, Improvements; and New Construction: Maintenance; New Construction; Public Works Projects; Civil Works Projects; Emergency Conservation Work; Landscape Work; Activities of Other Agencies Flora, Fauna and Natural Phenomena: Ranger, Naturalist; and Guide Service; Museum Service; Archeology; Flora; Birds; Animals Use of Park Facilities by the Public: Increase in Travel; Visitors Protection: Police Protection; Accidents; Rodent Control Miscellaneous Subjects of interest: Photograph of view from summit of West Temple Photograph of fireplace being installed in campground Stabilization of Nevada Switchback East Rim Trail West Rim Trail Stream protection between the lodge utility area and the Temple of Sinawava Employee residences Campground Comfort Stations East Entrance Checking Station and residence Pine Creek Irrigation East Rim Trail to Observation Point Campground development, stone fireplaces Sewer-water systems Stream protection Razing and reconstruction of warehouse Construction of South Entrance checking station South Entrance campground development Oak Creek residential area Oak Creek utility area Water use in Tropic for Bryce Ben Wetherill Climbed West Temple Travel Report of States up to January, 1934 Zion Travel Report for the Month of January, 1934 Zion Weather Report for the Month of January, 1934 Bryce Weather Report for the Month of January, 1934 Status of Personnel, January, 1934 Report of Park Revenues, January, 1934 Status of Authorized Projects, January, 1934: Zion Campground development; Sewer Water systems; Water System, East Entrance; Electric System, South Entrance; Stream Protections; Campground Service Roads; West Rim Trail; Equipment; Employees Quarters, headquarters, Comfort Station, South Entrance; Checking Station, East Entrance; Employee Quarters, East Entrance; Parking Area; Footpaths, headquarters; East Rim Trail improvements; Pine Creek Irrigations System; Roadside cleanup; Archeological Research; Topographic Surveys; Erosion Control and Stream Protection; Quarrying Stone; Bryce Equipment Shed; Boundary Fence; Post Construction of Roads; Headquarters Service Roads; Rim Trial Construction; Rim Footpaths; Equipment; Footpath, Lodge to rim; Footpath PA to rim; Lodge road widening; Lodge-Bryce Camp path; Prot railing, Bryce Point; Cabins, Employees; Ext to Office Building; Water System ext to buildings; Comfort Station; Water System ext to camp; Sewer System ext
Zion National Park Museum and Archives
This digital asset is in the public domain. When using this asset for any purpose, including online, credit: 'Courtesy Zion National Park, Museum Catalog Number 5087.'
Public domain:however please use copyright statement.
Document
Zion National Park, Code: ZION
NPS Museum Catalog Number : ZION 5087
NPS Museum Accession Number : ZION-01156
20160822
01/01/1934 - 01/30/1934
8.5x11 inch printed pages
Public Can View
Person: Museum Curator
Organization: Zion National Park
Position: Museum Curator
Address: Zion National Park, State Route 9, Springdale, UT 84767
Email: zion_museum@nps.gov

Friday, September 22, 2017 1:38:45 PM
Friday, September 22, 2017 1:38:45 PM
ZION_5087_Superintendents_Monthly_Report_1934_01.pdf
pdf
4.4 MB
Reports