A sidewalk along a stone wall appears in the right of the photo. Construction materials and orange construction cones are in the left half of the photo.
The portion of the new accessible sidewalk that will connect to the other accessible sidewalk is in the final stage of construction. Wire mesh and plates have been inserted and waiting for concrete to be poured.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.