Debris of brick and other materials being removed from partly standing bulkhead on the top of a roof of an industrial building.
Hoosac Deconstruction April 2025 Updates: Debris will be shoveled and loaded to a crane bin that is attached to the crane. The crane will then lower it down to the ground where it will dump the debris into a large dumpster.