The National Park Service is committed to making its electronic and information technologies accessible to individuals with disabilities.
If you require assistance or wish to report an issue related to the accessibility of any content on this website, please email
NPGallery@nps.gov
Report on the conditions of Zion and Bryce National Parks for January, 1934written on February 10, 1934
Topics include:
General: Introductory; General Weather Conditions
Administration: Park Inspections by Superintendent; Park Inspections by Other Interior Department Officers; Labor Situation; Plans, Maps, and Surveys; Publicity
Maintenance, Improvements; and New Construction: Maintenance; New Construction; Public Works Projects; Civil Works Projects; Emergency Conservation Work; Landscape Work;
Activities of Other Agencies
Flora, Fauna and Natural Phenomena: Ranger, Naturalist; and Guide Service; Museum Service; Archeology; Flora; Birds; Animals
Use of Park Facilities by the Public: Increase in Travel; Visitors
Protection: Police Protection; Accidents; Rodent Control
Miscellaneous
Subjects of interest:
Photograph of view from summit of West Temple
Photograph of fireplace being installed in campground
Stabilization of Nevada Switchback
East Rim Trail
West Rim Trail
Stream protection between the lodge utility area and the Temple of Sinawava
Employee residences
Campground Comfort Stations
East Entrance Checking Station and residence
Pine Creek Irrigation
East Rim Trail to Observation Point
Campground development, stone fireplaces
Sewer-water systems
Stream protection
Razing and reconstruction of warehouse
Construction of South Entrance checking station
South Entrance campground development
Oak Creek residential area
Oak Creek utility area
Water use in Tropic for Bryce
Ben Wetherill
Climbed West Temple
Travel Report of States up to January, 1934
Zion Travel Report for the Month of January, 1934
Zion Weather Report for the Month of January, 1934
Bryce Weather Report for the Month of January, 1934
Status of Personnel, January, 1934
Report of Park Revenues, January, 1934
Status of Authorized Projects, January, 1934: Zion Campground development; Sewer Water systems; Water System, East Entrance; Electric System, South Entrance; Stream Protections; Campground Service Roads; West Rim Trail; Equipment; Employees Quarters, headquarters, Comfort Station, South Entrance; Checking Station, East Entrance; Employee Quarters, East Entrance; Parking Area; Footpaths, headquarters; East Rim Trail improvements; Pine Creek Irrigations System; Roadside cleanup; Archeological Research; Topographic Surveys; Erosion Control and Stream Protection; Quarrying Stone; Bryce Equipment Shed; Boundary Fence; Post Construction of Roads; Headquarters Service Roads; Rim Trial Construction; Rim Footpaths; Equipment; Footpath, Lodge to rim; Footpath PA to rim; Lodge road widening; Lodge-Bryce Camp path; Prot railing, Bryce Point; Cabins, Employees; Ext to Office Building; Water System ext to buildings; Comfort Station; Water System ext to camp; Sewer System ext
Zion National Park Museum and Archives
This digital asset is in the public domain. When using this asset for any purpose, including online, credit: 'Courtesy Zion National Park, Museum Catalog Number 5087.'
Public domain:however please use copyright statement.
Person: Museum Curator Organization: Zion National Park Position: Museum Curator Address: Zion National Park, State Route 9, Springdale, UT 84767 Email: zion_museum@nps.gov