The National Park Service is committed to making its electronic and information technologies accessible to individuals with disabilities.
If you require assistance or wish to report an issue related to the accessibility of any content on this website, please email
NPGallery@nps.gov
Report on the conditions of Zion and Bryce National Parks and Cedar Breaks for June, 1935 written on July 10, 1935.
Topics include:
General: General Weather Conditions.
Administrative: Status of Work; Park Inspections by Superintendent; Park Inspections by National Park Service Officers; Park Inspections by Other Interior Department Officers; Park Inspections by Other Governmental Officers; Plans, Maps, and Surveys; Circular, Publicity.
Maintenance, Improvements; and New Construction: Maintenance; New Construction; Public Works; Emergency Conservation Work; Improvement of Approaches to Park.
Activities of Other Agencies: Public Service Contractors; Schedule of Rates; Complaints; Legislation Affecting Parks; Donations.
Flora, Fauna and Natural Phenomena: Ranger, Naturalist and Guide Service; Museum Service; Archeology; Flora; Animals; Geology.
Use of Park Facilities by the Public: Increase in Travel; Visitors.
Protection: Ranger Services; Fire Protection; Accidents.
Miscellaneous.
Subjects of Interest:
East Entrance Checking Station.
Bryce Cattle Guard.
Bryce Extension to Administration Building.
Protection Railing at Bryce Point.
Zion Camp NP-2: Boundary Fence; Eradication of Weeds.
Bryce Camp NP-3: Campground roads; Walks to lecture circle and cafeteria; Campground fireplaces; Campground benches and tables; Under Rim Fire Trail; Boundary Fence; Erosion Control; Checking Station; Betterment of Boat Mountain Road.
Zion Travel Report of States up to June, 1935.
Bryce Travel Report of States up to June, 1935.
Zion Travel Report for the Month of June, 1935.
Bryce Travel Report for the Month of June, 1935.
Zion and Bryce Summary of Educational Activities, June, 1935.
Zion Weather Report for the Month of June, 1935.
Bryce Weather Report for the Month of June, 1935.
Status of Personnel, June, 1935.
Report of Park Revenues, June, 1935.
Report of Sales of Publications, June, 1935.
Status of Authorized Projects, June, 1935: Zion Employee quarters, headquarters; Comfort station, south entrance; Campground development; Sewer-water system; Checking station; east entrance; Employee quarters, east entrance; Water system, east entrance; Electric system, south entrance; Stream protection; Campground service roads; West Rim Trail; Refrigerator Canyon Trail; Valley trails; Parking areas; Footpaths, headquarters; Equipment; Bryce Cabins, employees; Extension to office building; Water system extension to buildings; Comfort stations; Water system extension to camp; Sewer system extension; Equipment shed; Boundary fence; Post construction of roads; Headquarters service roads; Rim Trail construction; Rim footpaths; Equipment; Lodge road widening; Footpath, lodge to rim; Lodge-Bryce camp path; Footpaths, headquarters; Footpath, PA to rim; Prot railing, Bryce Point; Footpaths, asphalt surfacing; Telephone.
Zion National Park Museum and Archives
This digital asset is in the public domain. When using this asset for any purpose, including online, credit: 'Courtesy Zion National Park, Museum Catalog Number 5087.'
Public domain:however please use copyright statement.
Person: Museum Curator Organization: Zion National Park Position: Museum Curator Address: Zion National Park, State Route 9, Springdale, UT 84767 Email: zion_museum@nps.gov