A NPS worker is seen in the background to the right. He is working on the rubber moisture barrier. The historic masonry foundation is repaired with the footer installation. Construction tools and wood boards are seen near the newly installed footer.
Preservation crews begin the process of installing a rubber moisture barrier along the newly installed footer.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.