Construction on Arlington Memorial Bridge in October of 2019. Cranes on barges work on rehabilitating the bridge. A boat is in front of the bridge.
Select Item below to DOWNLOAD - Once item is selected, right click and choose 'save as'
d3bca440-429f-4893-a2a1-35d34ecb675e
Construction on Arlington Memorial Bridge 2019
Construction on Arlington Memorial Bridge in October of 2019. Cranes on barges work on rehabilitating the bridge. A boat is in front of the bridge.
Construction on Arlington Memorial Bridge in October 2019
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.
NPS / Jonathan Shafer
Public domain:Full Granting Rights
Image
George Washington Memorial Parkway, Code: GWMP
George Washington Memorial Parkway
Latitude: 38.7102088928223, Longitude: -77.0632629394531

10/04/2019
10/04/2019
Public Can View
NPS / Jonathan Shafer
NPS / Jonathan Shafer
Monday, December 16, 2019 9:45:43 AM
Monday, December 16, 2019 9:45:43 AM
GWMP_ARME_ConstructionFromRiverFront_20191004_JonathanShafer_01.JPG
Canon Canon, Canon EOS 5D Mark IV 100, EF70-200mm f/2.8L IS II USM
1/500 sec at f / 5
200 mm
ISO 100
Friday, October 4, 2019 11:33:21 PM
jpg
3.3 MB
2019-12-16T10:37:43-05:00
Scenic
ALBUMS IN WHICH THIS ASSET APPEARS