Select Item below to DOWNLOAD - Once item is selected, right click and choose 'save as'
97fca6c4-918e-4d55-ba40-52d88d7585f7
Trails 2011 Youth/Volunteers
Trail repairs were completed on schedule and signicant erosion and loss of assets was prevented. Over 15 tons of road base were installed on trail assets. Foot Bridge life was extended and is in excellent condition. This project was completed under budget due to multiple volunteer projects including Post to Parks Youth Mentorship, Energizer Battery Grant, US Army at Fort Carson's Better Opportunity for Single Soldiers (BOSS), and the Emily Griffith School work program. Over 800 hours of voluteer labor occurred to benefit the park and trail systems.
Trail repairs were completed on schedule and signicant erosion and loss of assets was prevented. Over 15 tons of road base were installed on trail assets. Foot Bridge life was extended and is in excellent condition. This project was completed under budget due to multiple volunteer projects including Post to Parks Youth Mentorship, Energizer Battery Grant, US Army at Fort Carson's Better Opportunity for Single Soldiers (BOSS), and the Emily Griffith School work program. Over 800 hours of voluteer labor occurred to benefit the park and trail systems.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.
Public domain
Image
Florissant Fossil Beds National Monument, Code: FLFO
Florissant Fossil Beds National Monument, Teller County, Colorado
Latitude: 38.9126014709473, Longitude: -105.279998779297

PMIS (Project Management Information System) : 167011
Legacy NPS Focus Record ID : 460955
06/24/2011
10/01/2010 - 09/30/2011
Public Can View
Florissant Fossil Beds National Monument STAFF
Troy Fuhrman
Monday, November 7, 2011 12:00:31 PM
Thursday, August 10, 2017 3:20:02 AM
FLFO-bd6cc172d4d14e80aac3c4d28656f110.jpg
Canon Canon, Canon EOS 5D Mark II
1/640 sec at f / 2.8
70 mm
ISO 100
Friday, June 24, 2011 4:38:33 PM
jpg
5.5 MB
Inventory , Budget