Point Reyes Lighthouse Restoration Project: Pathway between Garages and Paint Shed - July 4, 2019
A ten foot wide gravel path is lined by boards and overlaid with a grid of rebar in preparation of the pouring of concrete. Bushes line both sides of the pathway and a knee-high rock wall rises above the boards on the right. About 100 feet ahead on the right side of the path is a green building partially obscured by fog.
Contractors have prepared the pathway between the garages and the paint for the pouring of concrete. July 4, 2019.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.