BLRI - High Performance concrete being placed with an automatic screed.
High performance concrete being placed with an automatic screed. 1,300 square yards of high performance concrete was installed on bridge deck of the mainline bridge over US 421 at milepost 276. Drainage repairs were conducted, and 350 linear feet of mainline asphalt roadway surface was milled and overlaid. Overall project length was 0.14 miles.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.
PMIS (Project Management Information System) : 187147
05/28/2015
08/27/2015
PMIS 187147
Public Can View
Person: Andy Otten Organization: NPS-Denver Service Center - Transportation Division Role: Field Landscape Architect Position: Project Specialist Email: andy_otten@nps.gov