BLRI - High Performance concrete being placed with an automatic screed.
High performance concrete being placed with an automatic screed. 1,300 square yards of high performance concrete was installed on bridge deck of the mainline bridge over US 421 at milepost 276. Drainage repairs were conducted, and 350 linear feet of mainline asphalt roadway surface was milled and overlaid. Overall project length was 0.14 miles.
Permission must be secured from the individual copyright owners to reproduce any copyrighted materials contained within this website. Digital assets without any copyright restrictions are public domain.
Public domain
Image
Blue Ridge Parkway, Code: BLRI
PMIS (Project Management Information System) : 187147
05/28/2015
08/27/2015
PMIS 187147
Public Can View
Person: Andy Otten
Organization: NPS-Denver Service Center - Transportation Division
Role: Field Landscape Architect
Position: Project Specialist
Email: andy_otten@nps.gov

Wednesday, September 2, 2015 2:19:09 PM
Thursday, August 10, 2017 1:52:05 PM
BLRI-187147-A-2F25.JPG
Canon Canon, Canon PowerShot SD1200 IS
1/160 sec at f / 2.8
6.2 mm
ISO 160
Thursday, May 28, 2015 3:26:53 PM
jpg
3.2 MB
Inventory , Budget